Site Information

Site Location:*
Site Access Restrictions*:
Expected Geology if known:
Please advise on any contamination likely to be present:
 
Is water available on site?: *

Is the site secure?*:

Is welfare available on site?*:

 
Are there any specific certificates required:

CCNSGSPA PetrolLPSNRSWAOther

Please Specify Other:

Job Specification

Service Required*:
 
Please Specify Other:
Preferred Rig (If Known):
Any hard standing present at borehole locations?:

1.2m inspection pits required?:

Pease note if pits are required through concrete a minimum of 350mm core will be required. This will require our concrete trailer coring unit

 
Hard standing removal preference:
 

No of Boreholes*:
Depth of Boreholes*:
Preferred Flush*:
 
Is Sample recovery required?*:
 
In-Situ Testing*:
 
Type of Testing*:
DPSHDPSPT / CPTUT100Other
Please Specify Other:
Do you require a utility survey?*:
Borehole ClearanceFull Utility SurveyTopographical SurveyPAS 128 SurveyNo

More information:

Please note there is a limit of 512 characters in the more information field.

Installation

Installation*:
 
Install Type:
 
Pipe Internal Diameter:

Slot Size:

Cover Type:
 

PPE

As standard our crews will wear the following items of PPE:

  • Hard Hat
  • Coveralls
  • hi viz vest
  • Steel cap boots with steel mid sole
  • Ear defenders
  • Eye Protection

Are there any items of PPE required for the site not listed above?:

Contact Details

Name*:
 
Company*:
 
Email Address*:
 
Phone*:

Submit

Fill in CAPTCHA Field and click submit:
captcha